SFS 2 / SF 8
Status: Question model review passed; solution and completed SF authoring pending.
This is a generated authoring draft. Human approval and operational assessment results have not been supplied.
Question
Are backup jobs for critical services completed successfully at the required frequency throughout the review period to meet documented recovery point objectives?
Plain-language explanation
Model-reviewed question draft. Completed explanations and a canonical solution are pending. The proposed positive criterion is: Evidence shows backup jobs completed successfully at required intervals matching recovery point objectives
Assessment criterion and evidence
Actor: Organization. Scope: Critical services with documented recovery point objectives. Evidence period: Throughout the review period. Required evidence: Backup job completion logs showing timestamps and success status; Documentation specifying required backup frequency for each critical service. Negative criterion: Evidence shows missed schedules or failed jobs exceeding allowable recovery point objective tolerance. Missing evidence: Pending verification until backup job logs are provided
View the JSON record (opens in a new tab).
Assessment result: unset.